Nusa Konstruksi Enjiniring (DGIK), EPC contractor, plans to build mini hydro power plant (PLTM) in Tongar, West Pasaman (West Sumatera). This is first phase of its program to develop the renewable energy with capacity of 18 megawatts (MW). PLTM Tongar will have capacity of 6 MW built by DGIK’s subsidiary, PT Inti Duta Energi. This PLTM is targeted to operate in 2021. Inti Daya also has concession of PLTM projects in other six locations with total capacity of 40 MW.