Toba Bara Sejahtera (TOBA) through its subsidiary PT Gorontalo Listrik Perdana has obtained syndicated loan of US$171.7 million for funding coal fired power plant (PLTU) project in Gorontalo with capacity of 2×50 megawatts (MW). Bank Mandiri leads the loan syndication. The loan has tenor of 12 years (non revolving loan). This loan facility was signed in July 11, 2017.