The Ministry of Energy and Mineral Resources (ESDM) decided that the Masela Block will only need one Pre-Front End Engineering Design (Pre-FEED) study to be done by Inpex Corporation (INPEX). INPEX, however, asked to conduct three Pre-FEED studies.To subscribe please click here