State electricity firm Perusahaan Listrik Negara (PLN), under its power supply program for 2017-2026, targets to build power plant with total capacity of 125 giga watt (GW) by 2025. In 2019, PLN expects to supply additional 79 GW power capacity. While the renewable energy is targeted to reach 22.5% by 2025. Energy Minister, Ignatius Jonan, revealed that the revision of the said target will only be initiated if the external factor changed.